Project Gallery

  • backhoe-land-clearingdirt-haul-awayland-clearing-gradingcleared-residential-construction-siteinitial-home-site-land-clearing

    The Avorite job is a house for which Solid Foundation was the builder. We handled all site work including excavation, grading, footings, basement walls, slabs, driveways, and we are now starting the irrigation and landscaping.

    30-feet-home-site-excavation30-feet-home-site-over-excavation-to-hit-rockexcavation-below-water-tableexcavation-to-hit-rockhome-site-excavation-below-water-tablehome-site-excavationover-excavation-of-home-site

    The property needed extensive excavation work before construction could begin. Before starting the foundation, we had to over excavate about 30 feet down to hit rock. After excavation, the site was below the water table.

    structural-fill-deliverystructural-fill-material-deliveryunloading-structural-fill-materialstructural-site-fill-materialbackfill-deliverydumptruck-unloading-structural-backfill-materialbackfill-of-excavated-sitebackhoe-spreading-gravel-backfillbuilding-pad-backfillbackhoe-workfoundation-excavationbuilding-pad-fillgeotextile-fabric-installationunrolling-geotextile-fabriclaying-geotextile-fabric-over-building-pad

    Surge stone choked with #57 gravel, covered with filter fabric.

    We then hauled in 210 tri-axle loads of engineered structural fill dirt, per the direction of our on site geotechnical engineer, in order to bring the site up to grade. The design and work was monitored under the supervision of the geotechnical engineer during the entire hauling, spreading, and compaction process.

    excavation-work-at-nigh

    It was winter, so we were trying to beat the rain, working nights also.

         

    Laying rebar before pouring the foundation footings

    concrete-levelingpoured-concrete-circular-drivewaypoured-concrete-drivewaywet-concrete-drivewaycircular-driveway

    Wetting the concrete just after it begins to set prevents premature drying before the chemical process is finished. If allowed to dry too quickly, the concrete will not be as strong and will crack.

  • This project involved replacing a storm water pipe under a driveway. The old metal culvert had rusted through, allowing the water to leak out and erode the dirt out from under the driveway.

    preparing-for-driveway-demolitiondriveway-over-leaking-storm-water-pipestorm-drain-excavation

    Initial job site before work began.

    overgrown-brush-near-leaking-storm-pipegrubbing-area-before-pipe-replacementclearing-area-surrounding-storm-pipeclearing-storm-water-pipe-area

    Clearing away overgrown brush to expose the storm water drain.

    leaking-storm-drain-under-drivewaycoroded-leaking-storm-water-piperusted-leaking-driveway-culvert

    The storm water drain had rusted through allowing water to erode soil from beneath the driveway.

    leaing-strom-drain-causing-erosionerosion-under-drivewaystorm-drain-erosion-under-driveway

    Water leaking from the storm drain caused soil erosion under the driveway.

    storm-drain-excavationstorm-drain-removaldigging-up-old-storm-drainuncovering-old-storm-pipe-drain
    trench-for-new-storm-drain-pipeextracting-old-storm-pipe-drain
    excavation-for-new-storm-drainnew-storm-drain-trenchsolid-foundation-excavator-crew
    new-plastic-storm-pipenew-storm-drain-pipedriveway-replaced-over-storm-pipenew-driveway-over-storm-pipenew-poured-concrete-driveway

    A new PVC storm pipe was installed and concrete poured to replace the driveway.


  • damaged-concrete-near-dumpsterconcrete-demolition-removal-haul-awaypreparing-to-dowel-in-rebarrebar-dowel-in-preparationrebar-set-for-new-concretenew-rebar-installed

    The concrete drive in front of a dumpster at a strip mall had been damaged due to the heavy weight of the garbage truck. After removing the old, damaged concrete and poor sub grade, new rebar was doweled in and a stronger, thicker concrete was poured in. The new, beefed up slab will be able to withstand the stress under the garbage truck's weight.

  • site-for-new-drivewaymeasuring-new-driveway-sitejohn-deere-35d-skid-steer-mini-excavatornew-driveway-excavation-and-gradinginitial-driveway-site-excavationgrading-for-new-drivewayframing-for-drivewayframing-for-new-concrete-drivewaygraded-drivewaygraded-leveled-drivewaypouring-new-concrete-drivewayleveling-new-concrete-drivewayfreshly-poured-concrete-driveway

    A new driveway job that we did for an existing house to provide parking for the customer's RV.


  • A challenging sewer line replacement. It was 15 feet deep at the back alley where the lateral connected to the main.

    sewer-line-excavationlaying-pipe-for-new-sewer-linenew-pvc-sewer-linereplacing-a-sewer-linesewer-line-replacementlateral-connection-to-sewer-mainsewer-line-backfillgravel-backfill-over-sewer-line